Serene Beach Home with Pool! | House in Galveston

10.0 (2 Reviews) |   4 Bedrooms  2 Bathrooms  12 Guests
Pirates Beach West House | Serene Beach Home with Pool!

4 Bedroom House in Pirates Beach West, Galveston

Welcome to your new happy place! Sweet Serenity Homes would like to introduce you to Pirates Beach Treasure -- a fabulous home located in a wonderful beachside community in Galveston Texas. This home is designed with relaxation in mind to help you and your guests unwind. Amenities include:
* Private pool with gate lock and tropical setting in backyard of home
* Access to a private beach via a short walk thru the neighborhood (less than 10 min)
* Limited supply of beach essentials including beach chairs, wagon, and beach toys in garage
* Two balconies are available to enjoy the sunrise and serenity of beach waves crashing throughout the day
* Fully equipped kitchen
* High speed WIFI
* Multiple streaming apps available on each TV
* Work desk available on second level
* Ample parking available on driveway
Please note we require a lease agreement and pool waiver to be signed before any guest can gain access to the home.
No refunds are given for inclement of weather.

Serene Beach Home with Pool! is located in Pirates Beach West. Serene Beach Home with Pool! provides accommodation, featuring Pool, TV, Sports/Activities, among other amenities. This House features Pool, TV, Sports/Activities, to make your stay a comfortable one.

Serene Beach Home with Pool! has 4 Bedrooms , 2 Bathrooms, and max occupancy of 12 people. The minimum rental for this property is 1 nights, but this can change depending on the season you plan on staying. Previous guests have given good rated it, and VRBO labeled it a top-rated House because of the excellent services rendered by the owner or manager of this House, and has consistently provided great experiences for their guests. Most families or guests that use it recommend it to their friends and some of them are repeat guests. House has a friendly neighborhood, and the Pirates Beach West has interesting places to visit. If you want to learn more about the House in Pirates Beach West, such as places to visit and things to do nearby, you can check below to learn more.

Show more
OneKey Logos

This Property is OneKey Eligible

Earn OneKeyCash for every dollar spent on eligible vacation rentals, villas, cottages, cabins, and more when you book on Vrbo.

JOIN TODAY

Amenities

Air Conditioner
Parking
Pool
TV
View
Private Pool
Ocean View
Balcony/Terrace
Oceanfront
Security/Safety
Sports/Activities
Bedding/Linens
Wellness Facilities
Fireplace/Heating
Guest Services
Entertainment
Child Friendly
Internet
Kitchen
Laundry

Facility Overview

Air Conditioner
  • Heating
  • Air conditioning
Bathrooms
  • Hair dryer
  • Towels provided
  • Outdoor shower
  • 2 bathrooms
  • Bathtub or shower
Bedroom
  • 4 bedrooms
  • Bed sheets provided
  • Sofa bed
  • Dining table
  • Living room
Kitchen
  • Kitchen island
  • Refrigerator
  • Microwave
  • Coffee/tea maker
  • Stovetop
  • Toaster
  • Oven
  • Cookware/dishes/utensils
  • Dishwasher
Laundry
  • Near laundromat
  • Laundry facilities
  • Washing machine and dryer
Ocean view
  • Near the beach
Parking
  • Onsite parking
  • Onsite parking options include a garage
  • Car recommended
Pet Friendly
  • No pets allowed
Accessibility
  • Smoke-free property
Activities
  • Snorkeling nearby
  • Swimming nearby
  • Water tubing nearby
  • Kayaking nearby
  • Jet skiing nearby
  • Parasailing nearby
  • Golf nearby
  • Water park
  • Winery tours nearby
  • Theme parks nearby
Entertainment
  • Arcade/game room
  • Games
  • Smart TV
General
  • Unit size: 2900 sq ft (269 sq m)
  • Near a hospital
  • Near the sea
  • Desk
  • Desk chair
Guest Services
  • Iron/ironing board
Internet
  • Free WiFi, with speed of 100+ Mbps (good for 1–2 people or up to 6 devices)
Outdoors
  • Fenced yard
  • Balcony
  • Garden
Security/Safety
  • Carbon monoxide detector installed (host has indicated there is a carbon monoxide detector on the property)
  • Smoke detector installed (host has indicated there is a smoke detector on the property)
  • Deadbolt lock
Spa
  • Private pool

Policies

Check-in
Check-in time starts at 4:00 pm contactless check-in available minimum check-in age: 24
Check-out
Check-out before 10:00 am
Child Policy
Children are welcome.
Event Policy
No events allowed;no parties
Pet Policy
Pets not allowed
Smoking Policy
Smoking is not permitted

Extra-person charges may apply and vary depending on property policy government-issued photo identification and a credit card, debit card, or cash deposit may be required at check-in for incidental charges host has indicated there is a carbon monoxide detector on the property host has indicated there is a smoke detector on the property note from host: no parties onsite parties or group events are strictly prohibited property registration number gvr11168 safety features at this property include a deadbolt lock special requests are subject to availability upon check-in and may incur additional charges; special requests cannot be guaranteed this property is managed through our partner, vrbo. you will receive an email from vrbo with a link to a vrbo account, where you can change or cancel your reservation

License number: GVR11168

Reviews

Rosalinda S.
Sep 16, 2023 01:58:09 AM
Review Score:   5
Summary: Father’s birthday, awesome stay.
See All Reviews

FAQ's

Is this Pirates Beach West house pet-friendly for guests?

No, pets are not allowed at this property. Check the guest reviews to learn what guests had to share.

Does the Pirates Beach West house have a swimming pool?

Yes, this Pirates Beach West house has a swimming pool. Check the Facility Overview section for details about the pool and other available facilities.

How much does it cost per night to stay in Pirates Beach West house?

Best-rates for the Pirates Beach West house starts from $1,305 per night with includes Air Conditioner, View, Oceanfront, Bedding/Linens, Wellness Facilities, Laundry, Balcony/Terrace, Parking, Private Pool, Ocean View, Security/Safety, Kitchen, Pool, TV, Sports/Activities, Fireplace/Heating, Guest Services, Entertainment, Child Friendly, Internet with all other facilities. matches every traveler with their perfect accommodation, whether you are traveling with a group, friends, family, or pets.

Is Pirates Beach West house a family-friendly place to stay?

Based on the information we have received from the owner or our partner, this is considered to be a family-friendly property. Families have rated this house Good or guests have recommended them suitable for families. As reported by the owner or manager, the house has specified that children are welcome. Please see details about suitability for your family or inquire with the property to learn more.

Is the Pirates Beach West house wheelchair accessible or offer services for disabled guests?

Based on the information received from our partner, the Pirates Beach West house has not specified they are wheelchair accessible. Likewise, there is not an elevator specified as being available at the property. Specific accessibility details may be addressed in the property details section of this page.

What is the minimum night stay policy for the Pirates Beach West house?

Based on the information reported by the owner or manager, the Pirates Beach West house indicates 1 day stay policy at this house. Guests are cautioned that the minimum stay policy may differ based on seasonality or availability and may be at the discretion of the owner or manager.

What cancellation policy is in place for Pirates Beach West house?

Guests are cautioned that the cancellation policy may differ based on seasonality, availability, or current travel restrictions. Guests should also be aware that this policy may be subject to change and should be confirmed prior to booking. More details may be available on this page in the property description. However, early check-in or late check-out can sometimes be negotiated between the guest and the owner or the manager of this property.

Check House Availability
Nightly rates from:
USD1,305
You will be redirected to  
Hot Deal - It has been viewed 100 times today
Not the right fit? Check out our other properties in Pirates Beach West
Seaside Paradise Retreat From US $507
         

|
10.0 (1 Review)
House
  • Air Conditioner
  • Pool
  • View
Leviathan From US $500
         

|
10.0 (1 Review)
House
  • Air Conditioner
  • Pool
  • Wheelchair Accessible
Serene Beach Home with Pool! From US $1,305
         

10.0 (2 Reviews)
House
  • Air Conditioner
  • Parking
  • Pool
Pearl of the Sea From US $821
         

|
8.3 (3 Reviews)
House
  • Air Conditioner
  • Parking
  • View
Bluecockatoo - Beachside, King Bed, EV Charging! From US $265
         

10.0 (1 Review)
House
  • Air Conditioner
  • Parking
  • Pet Friendly