Luxurious chalet featuring a jacuzzi, pool, small lake, sauna and pool table. | Ski Chalet in Saint-Calixte
6 Bedroom Ski Chalet in Saint-Calixte
Escape and unwind with family or friends in this stunning log cabin. Nestled on a large estate in the heart of the Lanaudière forest, just 1.5 hours from Montreal, this retreat offers everything you need for a perfect getaway. Enjoy the hot tub, swimming pool, sauna, and billiard table, along with many other amenities.
Conveniently located near a variety of activities, including a zoo, water slides, tree-top adventures, and skiing, this is the ideal choice for any season.
Please note that the displayed price is for up to 16 guests, with an additional charge of $55 per night for each extra person.
Other things to note
TPS: 7/4871408RT0001
TVQ: 1/229142361TQ001
TVH: 1/229142361TQ002
Registration number
308660, expires: 2025-01-31
Luxurious chalet featuring a jacuzzi, pool, small lake, sauna and pool table is located in Saint-Calixte. Luxurious chalet featuring a jacuzzi, pool, small lake, sauna and pool table provides accommodation, featuring Pool, Private Pool, Ocean View, among other amenities. This Ski Chalet features Pool, Private Pool, Ocean View, to make your stay a comfortable one.
Luxurious chalet featuring a jacuzzi, pool, small lake, sauna and pool table has 6 Bedrooms , 3 Bathrooms, and max occupancy of 20 people. The minimum rental for this property is 1 nights, but this can change depending on the season you plan on staying. Previous guests have given good rated it, and VRBO labeled it a top-rated Ski Chalet because of the excellent services rendered by the owner or manager of this Ski Chalet, and has consistently provided great experiences for their guests. Most families or guests that use it recommend it to their friends and some of them are repeat guests. Ski Chalet has a friendly neighborhood, and the Saint-Calixte has interesting places to visit. If you want to learn more about the Ski Chalet in Saint-Calixte, such as places to visit and things to do nearby, you can check below to learn more.
Amenities
Facility Overview
-
Heating
-
Air conditioning
-
Hair dryer
-
Towels provided
-
3 bathrooms
-
Shampoo
-
Bidet
-
Toilet paper
-
Jetted bathtub
-
Bed sheets provided
-
6 bedrooms
-
Dining table
-
Wood stove
-
Dining room
-
Fireplace
-
Paper towels
-
Spices
-
Microwave
-
Dishwasher
-
Stovetop
-
Cookware/dishes/utensils
-
Coffee/tea maker
-
Oven
-
Refrigerator
-
Washing machine and dryer
-
Laundry facilities
-
Beach sun loungers
-
Limo/town car service
-
Onsite parking
-
Welcoming dogs only
-
Pet friendly
-
1 total pets
-
Smoke-free property
-
No elevators
-
Stereo
-
Smart TV
-
Arcade/game room
-
Table tennis
-
Pool or billiards table
-
Foosball table
-
Books
-
Recycling
-
French
-
Desk chair
-
Highchair
-
Travel crib
-
Children's dinnerware
-
Children's toys
-
Children's games
-
Children's books
-
Chef
-
Iron/ironing board
-
Free WiFi, with speed of 100+ Mbps (good for 1–2 people or up to 6 devices)
-
Outdoor furniture
-
Balcony
-
Barbecue grill
-
Firepit
-
Fire extinguisher
-
Carbon monoxide detector installed (host has indicated there is a carbon monoxide detector on the property)
-
Smoke detector installed (host has indicated there is a smoke detector on the property)
-
Hot tub
-
Outdoor pool
-
Sauna
-
Heated pool
-
Private pool
-
Massages
Policies
Extra-person charges may apply and vary depending on property policy government-issued photo identification and a credit card, debit card, or cash deposit may be required at check-in for incidental charges host has indicated there is a carbon monoxide detector on the property host has indicated there is a smoke detector on the property onsite parties or group events are strictly prohibited property registration number 308660, 2027-01-31 safety features at this property include a fire extinguisher special requests are subject to availability upon check-in and may incur additional charges; special requests cannot be guaranteed this property is managed through our partner, vrbo. you will receive an email from vrbo with a link to a vrbo account, where you can change or cancel your reservation
FAQ's
Is this Saint-Calixte ski chalet pet-friendly for guests?
Yes, pets are allowed at this property. Check the guest reviews to learn what guests had to share.
Does the Saint-Calixte ski chalet have a swimming pool?
Yes, this Saint-Calixte ski chalet has a swimming pool. Check the Facility Overview section for details about the pool and other available facilities.
How much does it cost per night to stay in Saint-Calixte ski chalet?
Best-rates for the Saint-Calixte ski chalet starts from $1,483 per night with includes Sports/Activities, Spa, Barbecue/Outdoor Cooking, Hot Tub, Pool, Private Pool, Ocean View, Balcony/Terrace, Fireplace/Heating, Internet, TV, View, Security/Safety, Bedding/Linens, Entertainment, Kitchen, Air Conditioner, Pet Friendly, Wellness Facilities, Child Friendly, Laundry, Parking with all other facilities. matches every traveler with their perfect accommodation, whether you are traveling with a group, friends, family, or pets.
Is Saint-Calixte ski chalet a family-friendly place to stay?
Based on the information we have received from the owner or our partner, this is considered to be a family-friendly property. Families have rated this ski chalet Good or guests have recommended them suitable for families. As reported by the owner or manager, the ski chalet has specified that children are welcome. Please see details about suitability for your family or inquire with the property to learn more.
Is the Saint-Calixte ski chalet wheelchair accessible or offer services for disabled guests?
Based on the information received from our partner, the Saint-Calixte ski chalet has not specified they are wheelchair accessible. Likewise, there is not an elevator specified as being available at the property. Specific accessibility details may be addressed in the property details section of this page.
What is the minimum night stay policy for the Saint-Calixte ski chalet?
Based on the information reported by the owner or manager, the Saint-Calixte ski chalet indicates 1 day stay policy at this ski chalet. Guests are cautioned that the minimum stay policy may differ based on seasonality or availability and may be at the discretion of the owner or manager.
What cancellation policy is in place for Saint-Calixte ski chalet?
Guests are cautioned that the cancellation policy may differ based on seasonality, availability, or current travel restrictions. Guests should also be aware that this policy may be subject to change and should be confirmed prior to booking. More details may be available on this page in the property description. However, early check-in or late check-out can sometimes be negotiated between the guest and the owner or the manager of this property.