5BR 4BA Luxury Villa with Private Heated Pool & Hot Tub! Close to Disney! | Villa in Davenport
5 Bedroom Villa in Highgate Park, Davenport
Private, luxury home with Amazing heated pool situated in a gated community. Beautifully decorated and furnished 5 bedrooms, 4 bathrooms to comfortably sleep 12 people. Private in-ground heated pool with jacuzzi spa (spa is a hot tub and when run will only heat up the spa area only) and BBQ grill at additional cost of $50 for stay. Pool has a child safe guard screen fence. *POOL HEATER AVAILABLE for only $40.00 a night**
Cleaning safety measures: Our cleaning crew follow and practice all safety and hygienic protocols.*
Each room is beautifully decorated, Flat-screen and Smart TVs in all bedrooms (except Mickey Mouse theme room), family room, media room and by pool area. Spacious Primary Suite w/ King bed, 2 walk-in closets, en suite, soaker tub, dual sinks, with a King bed. The rooms have the following Bed sizes:
*1 King bed (In Primary Suite)
*1 Full bed located on first level with a beautiful view of the pool area. It has a sliding door walk out entrance to the pool area
*1 Full bed located on second level
*1 Full pull out couch located on first level in Media room
*1 Twin bunk beds (2 beds - 1 on top and 1 on bottom) - on second level
*1 Twin bed - on second level
Home has modern and luxury light fixtures throughout home. We thought of everything, so all you have to do is arrive and relax! High-speed internet & cable, Washer & Driver; Garage Game room with basketball game, Media room on lower level - grab your popcorn and enjoy stream movies, upstairs loft with gaming area - fun for the entire family, it boasts: Arcade Game, 10-in-1 Combo Interchangeable Game Table Set lets you play slide hockey, ping pong, pool, foosball, billiards, shuffleboard, table tennis, chess, cards, checkers, bowling, and backgammon. We also have card games such as Uno and board games, etc. Furnished Patio/Lanai with dining table and patio lounge seating sofas with pool area Smart Tv. It is close to Walmart, Grocery Stores (Publix about 1/2 mile away), great shopping, fine restaurants and dining, and all the Disney amusement parks (Uber and Lyft services available) as well as all the other wonderful things to do in and near Orlando.
Security Disclaimer of Camera: For safety of guests, we have a Ring camera doorbell. Also, we have a side camera on the side of the house that points in the direction of the walkway leading to the street. This is a safety feature camera to monitor activity entering the back entrance and to monitor pool equipment to ensure no tampering. Also, camera facing driveway and street.
No Party Policy: It is our strict policy to forbid any parties/raves at the property.
5BR 4BA Luxury Villa with Private Heated Pool & Hot Tub! Close to Disney! is located in Highgate Park. 5BR 4BA Luxury Villa with Private Heated Pool & Hot Tub! Close to Disney! provides accommodation, featuring Private Pool, Sports/Activities, Bedding/Linens, among other amenities. This Villa features Private Pool, Sports/Activities, Bedding/Linens, to make your stay a comfortable one.
5BR 4BA Luxury Villa with Private Heated Pool & Hot Tub! Close to Disney! has 5 Bedrooms , 3 Bathrooms, and max occupancy of 12 people. The minimum rental for this property is 1 nights, but this can change depending on the season you plan on staying. Previous guests have given good rated it, and VRBO labeled it a top-rated Villa because of the excellent services rendered by the owner or manager of this Villa, and has consistently provided great experiences for their guests. Most families or guests that use it recommend it to their friends and some of them are repeat guests. Villa has a friendly neighborhood, and the Highgate Park has interesting places to visit. If you want to learn more about the Villa in Highgate Park, such as places to visit and things to do nearby, you can check below to learn more.
Amenities
Facility Overview
-
Air conditioning
-
Heating
-
Towels provided
-
Soap
-
Hair dryer
-
Toilet paper
-
3+ bathrooms
-
Bathtub or shower
-
Shampoo
-
Bed sheets provided
-
Sofa bed
-
5 bedrooms
-
Dining table
-
Living room
-
Fireplace
-
Dining room
-
Ice maker
-
Dishwasher
-
Spices
-
Stovetop
-
Refrigerator
-
Toaster
-
Microwave
-
Coffee/tea maker
-
Oven
-
Washing machine and dryer
-
Laundry facilities
-
Beach towels
-
Beach sun loungers
-
Onsite parking options include a garage
-
Onsite parking
-
No pets allowed
-
Smoke-free property
-
If you have requests for specific accessibility needs, please contact the property using the information on the reservation confirmation received after booking.
-
No elevators
-
Upper floors accessible by stairs only
-
Tennis on site
-
Golf nearby
-
Fitness facilities nearby
-
Cycling nearby
-
Water park nearby
-
Ecotours nearby
-
Basketball nearby
-
Swimming nearby
-
Theme parks nearby
-
Arcade/game room
-
Table tennis
-
Games
-
Foosball table
-
Smart TV with cable/satellite service
-
Books
-
Music library
-
Pool or billiards table
-
Video games
-
Stereo
-
Gated community
-
Unit size: 2451 sq ft (228 sq m)
-
English
-
Next to a golf course
-
In the city center
-
Near a health or beauty spa
-
Near a hospital
-
Near outlet shopping
-
Near a zoo
-
Desk
-
Desk chair
-
Children's books
-
Children's dinnerware
-
Children's games
-
Playground
-
Highchair
-
Children's toys
-
Iron/ironing board
-
Free WiFi
-
Fenced yard
-
Barbecue grill
-
Outdoor furniture
-
Furnished lanai
-
Garden
-
First aid kit
-
Deadbolt lock
-
Carbon monoxide detector installed (host has indicated there is a carbon monoxide detector on the property)
-
Fire extinguisher
-
Smoke detector installed (host has indicated there is a smoke detector on the property)
-
Heated pool
-
Fence around the pool
-
Outdoor pool
-
Hot tub
-
Private pool
Policies
Cashless transactions are available extra-person charges may apply and vary depending on property policy government-issued photo identification and a credit card, debit card, or cash deposit may be required at check-in for incidental charges host has indicated there is a carbon monoxide detector on the property host has indicated there is a smoke detector on the property long-term renters welcome onsite parties or group events are strictly prohibited safety features at this property include a fire extinguisher, a first aid kit, and a deadbolt lock special requests are subject to availability upon check-in and may incur additional charges; special requests cannot be guaranteed this property is managed through our partner, vrbo. you will receive an email from vrbo with a link to a vrbo account, where you can change or cancel your reservation
Reviews
FAQ's
Is this Highgate Park villa pet-friendly for guests?
No, pets are not allowed at this property. Check the guest reviews to learn what guests had to share.
Does the Highgate Park villa have a swimming pool?
Yes, this Highgate Park villa has a swimming pool. Check the Facility Overview section for details about the pool and other available facilities.
How much does it cost per night to stay in Highgate Park villa?
Best-rates for the Highgate Park villa starts from $204 per night with includes Fireplace/Heating, Entertainment, Laundry, Private Pool, Sports/Activities, Bedding/Linens, Guest Services, Barbecue/Outdoor Cooking, Child Friendly, Air Conditioner, Pool, TV, Balcony/Terrace, Security/Safety, Wellness Facilities, Parking, View, Ocean View, Hot Tub, Internet, Kitchen with all other facilities. matches every traveler with their perfect accommodation, whether you are traveling with a group, friends, family, or pets.
Is Highgate Park villa a family-friendly place to stay?
Based on the information we have received from the owner or our partner, this is considered to be a family-friendly property. Families have rated this villa Good or guests have recommended them suitable for families. As reported by the owner or manager, the villa has specified that children are welcome. Please see details about suitability for your family or inquire with the property to learn more.
Is the Highgate Park villa wheelchair accessible or offer services for disabled guests?
Based on the information received from our partner, the Highgate Park villa has not specified they are wheelchair accessible. Likewise, there is not an elevator specified as being available at the property. Specific accessibility details may be addressed in the property details section of this page.
What is the minimum night stay policy for the Highgate Park villa?
Based on the information reported by the owner or manager, the Highgate Park villa indicates 1 day stay policy at this villa. Guests are cautioned that the minimum stay policy may differ based on seasonality or availability and may be at the discretion of the owner or manager.
What cancellation policy is in place for Highgate Park villa?
Guests are cautioned that the cancellation policy may differ based on seasonality, availability, or current travel restrictions. Guests should also be aware that this policy may be subject to change and should be confirmed prior to booking. More details may be available on this page in the property description. However, early check-in or late check-out can sometimes be negotiated between the guest and the owner or the manager of this property.